Customer cases
See what we’ve done previously
Machine relocation – Reconstruction
We completed modifications to walkways, stairs, and railings, as well as the fabrication of new bollards impact protection barriers to enhance safety.
Machine relocation
At Skoghall Raumaster, we replaced the conveyor belt feeding the carton roll packaging line.
We installed the new system and associated welding around it to integrate the new components with the remaining parts of the existing structure.
Machine relocation
A complete relocation of the machine park from Svets Mekaniska in Hällefors to its new site at Ovako Hällefors.
The assignment included the dismantling, transportation, and reinstallation of all machinery.
To ensure precise positioning, we used a Trimble S9 HP for measurement and installation, achieving maximum accuracy throughout the process.
Machine relocation – Measurement
Relocation of a machining line. We were involved in the entire process, from the initial dismantling to the final commissioning of the line. After dismantling the old equipment, we constructed the new line. Using a Trimble S9 HP, Björn was able to precisely position the machinery with millimeter accuracy, followed by the final installation of the machines and the entire line.
Machine relocation
Relocation and installation of two casting cells from Ljunghäll AB to IAC Hultsfred.
Reconstruction
During the rebuild of paper machine PM9, we had up to 60 people on site to carry out a large-scale, time-sensitive project.
Installation
We carried out a mill refurbishment project at Barilla. We upgraded the equipment by dismantling the existing system and installing a new one.
Installation
Several years ago, we built Renewcell’s development machine in Kristinehamn and were therefore also involved when a new drying machine was to be built in Sundsvall. The drying machine was constructed using a used machine that had previously been in France.
Machine relocation
Machine relocation from Nexans Karmøy, Norway to Nexans AB Grimsås, Sweden! Measurement, labeling, and documentation before mechanical and electrical disassembly. Transport from Norway to Nexans Grimsås, Sweden. Mechanical and electrical assembly and commissioning.
Machine relocation
Relocation and installation of IMI – Hydronic production lines, for improved production flow and better use of facilities.
Installation
Evomatic AB – manufacturing and automation of machines. Photos from Malaysia.
Installation
We are in an exciting phase, having just started developing our collaboration with Carlstad Machinetools, the Swedish agent for Nicolás Correa. Over the years, we have worked closely together and are therefore very pleased to take this positive partnership a step further.
A selection of our projects
Here you can see a selection of projects we’ve carried out
worldwide and across a wide range of industries over the years.
2026
Nexans Norway – Machine alignment and measurement
Billerud Skärblacka – Maintenance shutdown, including various new installations and modifications of existing machinery
Ljunghäll AB – Ongoing maintenance
2025
Mondi Dynäs AB – Ongoing maintenance
Sylvamo Nymölla – Ongoing maintenance and installation of an air turn system on PM1
Billerud Skärblacka – Ongoing maintenance
Deublin – Installation of a new condensate system
Barilla Filipstad – Crane refurbishment
Ovako Hällefors – Major installation project
Ljunghäll AB – Ongoing maintenance
Structural steelwork – New facility in Karlstad
Arctic Paper Grycksbo AB – Major rebuild of the drive system on PM9, among other works
Granitor Göteborg – Reconstruction work at Volvo Cars for Granitor
2024
Talent Plastics Laxå – Ongoing maintenance
Arvika Gjuteri – Major refurbishment of a casting line
IMI Hydronic Engineering – Internal machine relocation to improve production flow
Ljunghäll AB – Ongoing maintenance
BillerudKorsnäs – Rebuild of a rewinder
Fortum Waste Solutions AB – Summer shutdown and various maintenance works
Billerud Gruvön – Ongoing maintenance
Intersystem – Installation of a conveyor system
Ukraine – Pro bono dismantling of diesel generators, which were then shipped to Ukraine
Stora Enso Skoghall – Ongoing maintenance
2023
Fortum Waste Solutions AB – Summer shutdown and various maintenance works
SAFT AB – Installation of a complete production line
BillerudKorsnäs – Maintenance work
Outokumpu Stainless AB – Refurbishment of a pinch roll
Kaffehuset Karlstad – Ongoing maintenance
Ovako Hällefors –
Nexans Norway – Installation and commissioning of a new machine line in a new cable factory
Sylvamo Nymölla – Ongoing maintenance
2023
Mondi Dynäs AB – Ongoing maintenance
Holmen Paper AB – Roll alignment and measurement
ORAB Entreprenad – Measurement and alignment of pumps and agitators
Northvolt Labs AB – Dismantling and packing of a new production line
Stora Enso Skoghall – Ongoing maintenance
Voith Högsjö – Dismantling of looms
Car-O-Liner Kungsör – Installation of a new bed milling machine for Corea
2022
Buhler Group Die Casting, Husqvarna AB – Installation av aluminiumpress gjutcell.
Evomatic, Karlshamn – Montering av Automatisk transportsystem för pallar hos BBraun medical Malaysia.
Flytt av två gjutceller från gamla fueltech i Ronneby till IAC i Hultsfred.
Nexans, Halden – Utsättning av koordinatsystem i ny anläggning.
2021
IMI-Hydronic, Ljung – Internal relocation of machines to improve production flow.
Söderenergi AB, Södertälje – Replacement of drives on fans and pumps.
Lessebo Paper AB – General repairs at the paper mill.
Re:newcell, Sundsvall – Assembly of pulp drying machine.
Probat, Kaffehuset (Löfbergs), Karlstad – Installation of new roasting equipment.
2020
Buhler Group Die Casting, Husqvarna AB – Installation of aluminum press casting cell.
Northvolt Labs, Västerås – Installation of various machines.
2019
Northvolt Labs Västerås – Installation of coaters and drying ovens.
Nexans Halden – Renovation of cable machine.
RadScan, Falun – Reconstruction of flue gas cleaning system.
Sofidel fine paper mill, Kisa – Renovation of press rolls.
2018
Bilfinger, power industry – Subcontractor for Bilfinger providing service and maintenance within the power industry.
2017/2018
Data/server hall – Disassembly, packing, shipping, and assembly of a server hall. Relocated from Germany and installed in Sweden.
Stone/slab facility – Disassembly and relocation of a facility on behalf of Naturstenskompaniet.
Stone/slab facility – Disassembly and relocation of a facility on behalf of Naturstenskompaniet.
2017
Enviro Recycling/Tyre Recycling – Ongoing maintenance and service of tire recycling operations.
2016/2017
Cable manufacturing – Disassembly, packing, shipping, assembly, and reconstruction of a cable factory within the Nexans group. Relocated from Haugesund, Norway to Grimsås, Sweden.
Steel industry – Clearance of Ovako Forsbacka’s facility with relocation to Ovako plants in Smedjebacken, Hällefors, and Boxholm.
Steel industry – Clearance of Ovako Forsbacka’s facility with relocation to Ovako plants in Smedjebacken, Hällefors, and Boxholm.
2016
Re:newcell – Large-scale textile recycling based on new research and technology. Assembly, setup and commissioning assistance, followed by ongoing maintenance and service.
2015/2016
Steel industry – Relocation of tempering furnaces within Ovako Hofors.
2014/2015
AerospaceTech – Disassembly of test rig in Bromma, followed by packing and shipping to the Technical University of Shanghai.
2014
Petrochemical facility – Labeling, disassembly, and packing of a facility in Bamble, Norway.
2013
Paper manufacturing – Labeling, disassembly, and packing of a tissue (fine paper) machine from Jönköping to Thailand.
2012-2014
Enviro Recycling/Tyre Recycling – Tire recycling, assembly and construction of the facility.
2012
Aluminum foundry – Disassembly, packing, shipping, and assembly of two casting cells from Australia to Switzerland.
2011
Steel industry – Disassembly, renovation, assembly, and reconstruction of seam milling machines for Outokumpu.
2010
Power plants – Ongoing service and maintenance, shutdowns, reconstruction, and standby support.
2009
Paper mill – Disassembly and packing of Åsens mill.
2009
Hejarsmedja in Virsbo – ongoing shutdowns, regular maintenance, and standby support.
2008
Hejarsmedja – Relocation of a 1,000-ton press from Kolsva to Virsbo.
2006
Floor manufacturing – Turnkey project (disassembly, packing, transport, assembly) for the relocation of Tarkett’s flooring factory. Relocated from Broby, Sweden to southern Poland.
2005/2006
Aluminum foundry – Relocation of a machine to Vyborg, Russia for Alteams.
2005
Alteams, Die-casting – Relocation of the die-casting factory to new premises
2004/2005
Paper mill – Reconstruction of two paper machines in Tunisia, including installation of new machines.
2004
Aluminum foundry – Installation of a used casting machine in China
2004
Paper mills, steel industry, power plants, etc. Ongoing – Annual shutdowns/maintenance at various facilities within the groups BillerudKorsnäs, Stora Enso, Outokumpu, Kils Energi AB, and others.
2003
Paper mill – Shutdown at Utansjö
Paper mill – Service and maintenance at Grycksbo Paper Mill
Paper mill – Installation of a paper mill in Vietnam
Oxygen plant – Disassembly and shipping of oxygen plant from Borlänge, Sweden to India