The scope included dismantling the existing hood and the line shaft drive, followed by the design and fabrication of new frames for the press drives. We then completed the installation of new drive systems for the press section, dryer section, and calendar.
This advanced project demanded high precision, meticulous planning, and close collaboration at every stage of the process.