Timeline

Timeline

2023

Mondi Dynäs AB – Ongoing maintenance
Holmen Paper AB – Roll alignment and measurement
ORAB Entreprenad – Measurement and alignment of pumps and agitators
Northvolt Labs AB – Dismantling and packing of a new production line
Stora Enso Skoghall – Ongoing maintenance
Voith Högsjö – Dismantling of looms
Car-O-Liner Kungsör – Installation of a new bed milling machine for Corea

Timeline

2026

Nexans Norway – Machine alignment and measurement
Billerud Skärblacka – Maintenance shutdown, including various new installations and modifications of existing machinery
Ljunghäll AB – Ongoing maintenance

Timeline

2025

Mondi Dynäs AB – Ongoing maintenance
Sylvamo Nymölla – Ongoing maintenance and installation of an air turn system on PM1
Billerud Skärblacka – Ongoing maintenance
Deublin – Installation of a new condensate system
Barilla Filipstad – Crane refurbishment
Ovako Hällefors – Major installation project
Ljunghäll AB – Ongoing maintenance
Structural steelwork – New facility in Karlstad
Arctic Paper Grycksbo AB – Major rebuild of the drive system on PM9, among other works
Granitor Göteborg – Reconstruction work at Volvo Cars for Granitor

Timeline

2024

Talent Plastics Laxå – Ongoing maintenance
Arvika Gjuteri – Major refurbishment of a casting line
IMI Hydronic Engineering – Internal machine relocation to improve production flow
Ljunghäll AB – Ongoing maintenance
BillerudKorsnäs – Rebuild of a rewinder
Fortum Waste Solutions AB – Summer shutdown and various maintenance works
Billerud Gruvön – Ongoing maintenance
Intersystem – Installation of a conveyor system
Ukraine – Pro bono dismantling of diesel generators, which were then shipped to Ukraine
Stora Enso Skoghall – Ongoing maintenance

Timeline

2023

Fortum Waste Solutions AB – Summer shutdown and various maintenance works
SAFT AB – Installation of a complete production line
BillerudKorsnäs – Maintenance work
Outokumpu Stainless AB – Refurbishment of a pinch roll
Kaffehuset Karlstad – Ongoing maintenance
Ovako Hällefors –
Nexans Norway – Installation and commissioning of a new machine line in a new cable factory
Sylvamo Nymölla – Ongoing maintenance

Timeline

2022

Buhler Group Die Casting, Husqvarna AB – Installation av aluminiumpress gjutcell.
Evomatic, Karlshamn – Montering av Automatisk transportsystem för pallar hos BBraun medical Malaysia.
Flytt av två gjutceller från gamla fueltech i Ronneby till IAC i Hultsfred.
Nexans, Halden – Utsättning av koordinatsystem i ny anläggning.

Timeline

2021

IMI-Hydronic, Ljung – Internal relocation of machines to improve production flow.
Söderenergi AB, Södertälje – Replacement of drives on fans and pumps.
Lessebo Paper AB – General repairs at the paper mill.
Re:newcell, Sundsvall – Assembly of pulp drying machine.
Probat, Kaffehuset (Löfbergs), Karlstad – Installation of new roasting equipment.

Timeline

2020

Buhler Group Die Casting, Husqvarna AB – Installation of aluminum press casting cell.
Northvolt Labs, Västerås – Installation of various machines.

Timeline

2003

Paper mill – Shutdown at Utansjö
Paper mill – Service and maintenance at Grycksbo Paper Mill
Paper mill – Installation of a paper mill in Vietnam
Oxygen plant – Disassembly and shipping of oxygen plant from Borlänge, Sweden to India

Timeline

2004

Paper mills, steel industry, power plants, etc. Ongoing – Annual shutdowns/maintenance at various facilities within the groups BillerudKorsnäs, Stora Enso, Outokumpu, Kils Energi AB, and others.

Timeline

2006

Floor manufacturing – Turnkey project (disassembly, packing, transport, assembly) for the relocation of Tarkett’s flooring factory. Relocated from Broby, Sweden to southern Poland.

Timeline

2011

Steel industry – Disassembly, renovation, assembly, and reconstruction of seam milling machines for Outokumpu.

Timeline

2012

Aluminum foundry – Disassembly, packing, shipping, and assembly of two casting cells from Australia to Switzerland.

Timeline

2013

Paper manufacturing – Labeling, disassembly, and packing of a tissue (fine paper) machine from Jönköping to Thailand.

Timeline

2014/2015

AerospaceTech – Disassembly of test rig in Bromma, followed by packing and shipping to the Technical University of Shanghai.

Timeline

2016

Re:newcell – Large-scale textile recycling based on new research and technology. Assembly, setup and commissioning assistance, followed by ongoing maintenance and service.

Timeline

2016/2017

Cable manufacturing – Disassembly, packing, shipping, assembly, and reconstruction of a cable factory within the Nexans group. Relocated from Haugesund, Norway to Grimsås, Sweden.


Steel industry – Clearance of Ovako Forsbacka’s facility with relocation to Ovako plants in Smedjebacken, Hällefors, and Boxholm.

Timeline

2017/2018

Data/server hall – Disassembly, packing, shipping, and assembly of a server hall. Relocated from Germany and installed in Sweden.


Stone/slab facility – Disassembly and relocation of a facility on behalf of Naturstenskompaniet.

Timeline

2018

Bilfinger, power industry – Subcontractor for Bilfinger providing service and maintenance within the power industry.

Timeline

2019

Northvolt Labs Västerås – Installation of coaters and drying ovens.
Nexans Halden – Renovation of cable machine.
RadScan, Falun – Reconstruction of flue gas cleaning system.
Sofidel fine paper mill, Kisa – Renovation of press rolls.