Author name: aztek

Timeline

2023

Mondi Dynäs AB – Ongoing maintenance
Holmen Paper AB – Roll alignment and measurement
ORAB Entreprenad – Measurement and alignment of pumps and agitators
Northvolt Labs AB – Dismantling and packing of a new production line
Stora Enso Skoghall – Ongoing maintenance
Voith Högsjö – Dismantling of looms
Car-O-Liner Kungsör – Installation of a new bed milling machine for Corea

Timeline

2026

Nexans Norway – Machine alignment and measurement
Billerud Skärblacka – Maintenance shutdown, including various new installations and modifications of existing machinery
Ljunghäll AB – Ongoing maintenance

Timeline

2025

Mondi Dynäs AB – Ongoing maintenance
Sylvamo Nymölla – Ongoing maintenance and installation of an air turn system on PM1
Billerud Skärblacka – Ongoing maintenance
Deublin – Installation of a new condensate system
Barilla Filipstad – Crane refurbishment
Ovako Hällefors – Major installation project
Ljunghäll AB – Ongoing maintenance
Structural steelwork – New facility in Karlstad
Arctic Paper Grycksbo AB – Major rebuild of the drive system on PM9, among other works
Granitor Göteborg – Reconstruction work at Volvo Cars for Granitor

Timeline

2024

Talent Plastics Laxå – Ongoing maintenance
Arvika Gjuteri – Major refurbishment of a casting line
IMI Hydronic Engineering – Internal machine relocation to improve production flow
Ljunghäll AB – Ongoing maintenance
BillerudKorsnäs – Rebuild of a rewinder
Fortum Waste Solutions AB – Summer shutdown and various maintenance works
Billerud Gruvön – Ongoing maintenance
Intersystem – Installation of a conveyor system
Ukraine – Pro bono dismantling of diesel generators, which were then shipped to Ukraine
Stora Enso Skoghall – Ongoing maintenance

Timeline

2023

Fortum Waste Solutions AB – Summer shutdown and various maintenance works
SAFT AB – Installation of a complete production line
BillerudKorsnäs – Maintenance work
Outokumpu Stainless AB – Refurbishment of a pinch roll
Kaffehuset Karlstad – Ongoing maintenance
Ovako Hällefors –
Nexans Norway – Installation and commissioning of a new machine line in a new cable factory
Sylvamo Nymölla – Ongoing maintenance

Maskin lastad på lastbilflak
Customer cases

Relocation at Ovako Hällefors

A complete relocation of the machine park from Svets Mekaniska in Hällefors to its new site at Ovako Hällefors.
The assignment included the dismantling, transportation, and reinstallation of all machinery.
To ensure precise positioning, we used a Trimble S9 HP for measurement and installation, achieving maximum accuracy throughout the process.

Customer cases

Measurement and relocation at Ovako Group

Relocation of a machining line. We were involved in the entire process, from the initial dismantling to the final commissioning of the line. After dismantling the old equipment, we constructed the new line. Using a Trimble S9 HP, Björn was able to precisely position the machinery with millimeter accuracy, followed by the final installation of the machines and the entire line.

Timeline

2022

Buhler Group Die Casting, Husqvarna AB – Installation av aluminiumpress gjutcell.
Evomatic, Karlshamn – Montering av Automatisk transportsystem för pallar hos BBraun medical Malaysia.
Flytt av två gjutceller från gamla fueltech i Ronneby till IAC i Hultsfred.
Nexans, Halden – Utsättning av koordinatsystem i ny anläggning.

Timeline

2021

IMI-Hydronic, Ljung – Internal relocation of machines to improve production flow.
Söderenergi AB, Södertälje – Replacement of drives on fans and pumps.
Lessebo Paper AB – General repairs at the paper mill.
Re:newcell, Sundsvall – Assembly of pulp drying machine.
Probat, Kaffehuset (Löfbergs), Karlstad – Installation of new roasting equipment.

Timeline

2020

Buhler Group Die Casting, Husqvarna AB – Installation of aluminum press casting cell.
Northvolt Labs, Västerås – Installation of various machines.

Timeline

2003

Paper mill – Shutdown at Utansjö
Paper mill – Service and maintenance at Grycksbo Paper Mill
Paper mill – Installation of a paper mill in Vietnam
Oxygen plant – Disassembly and shipping of oxygen plant from Borlänge, Sweden to India

Timeline

2004

Paper mills, steel industry, power plants, etc. Ongoing – Annual shutdowns/maintenance at various facilities within the groups BillerudKorsnäs, Stora Enso, Outokumpu, Kils Energi AB, and others.

Timeline

2006

Floor manufacturing – Turnkey project (disassembly, packing, transport, assembly) for the relocation of Tarkett’s flooring factory. Relocated from Broby, Sweden to southern Poland.

Timeline

2011

Steel industry – Disassembly, renovation, assembly, and reconstruction of seam milling machines for Outokumpu.

Timeline

2012

Aluminum foundry – Disassembly, packing, shipping, and assembly of two casting cells from Australia to Switzerland.

Timeline

2013

Paper manufacturing – Labeling, disassembly, and packing of a tissue (fine paper) machine from Jönköping to Thailand.

Timeline

2014/2015

AerospaceTech – Disassembly of test rig in Bromma, followed by packing and shipping to the Technical University of Shanghai.

Timeline

2016

Re:newcell – Large-scale textile recycling based on new research and technology. Assembly, setup and commissioning assistance, followed by ongoing maintenance and service.

Timeline

2016/2017

Cable manufacturing – Disassembly, packing, shipping, assembly, and reconstruction of a cable factory within the Nexans group. Relocated from Haugesund, Norway to Grimsås, Sweden.


Steel industry – Clearance of Ovako Forsbacka’s facility with relocation to Ovako plants in Smedjebacken, Hällefors, and Boxholm.

Timeline

2017/2018

Data/server hall – Disassembly, packing, shipping, and assembly of a server hall. Relocated from Germany and installed in Sweden.


Stone/slab facility – Disassembly and relocation of a facility on behalf of Naturstenskompaniet.

Timeline

2018

Bilfinger, power industry – Subcontractor for Bilfinger providing service and maintenance within the power industry.

Timeline

2019

Northvolt Labs Västerås – Installation of coaters and drying ovens.
Nexans Halden – Renovation of cable machine.
RadScan, Falun – Reconstruction of flue gas cleaning system.
Sofidel fine paper mill, Kisa – Renovation of press rolls.

Customer cases

Renewcell in Sundsvall

Several years ago, we built Renewcell’s development machine in Kristinehamn and were therefore also involved when a new drying machine was to be built in Sundsvall. The drying machine was constructed using a used machine that had previously been in France.

Customer cases

Nexans

Machine relocation from Nexans Karmøy, Norway to Nexans AB Grimsås, Sweden! Measurement, labeling, and documentation before mechanical and electrical disassembly. Transport from Norway to Nexans Grimsås, Sweden. Mechanical and electrical assembly and commissioning.